Quick Answer: Vpack Machine Pvt. Ltd. is a mineral water plant manufacturer based in Pooth Khurd, New Delhi. It builds complete plants — Industrial RO, storage tanks, bottle rinsing-filling-capping, labeling and shrink packing — at 24, 30, 60 or 90 bottles per minute for 200 ml bottles to 20-litre jars, installed in 15–45 days. With 14 years of experience, Vpack has 3,000+ installations across India and exports to Dubai, Kenya, Uganda and Sri Lanka.

Technical Specifications

SpecificationVpack mineral water plant
ManufacturerVpack Machine Pvt. Ltd
Capacity24, 30, 60, 90 BPM
Pack sizes200 ml – 20 L
Contact partsSS 304 food-grade
Installation15–45 days, with training
Space needed1,500–3,000 sq. ft. covered
Licence (2026)FSSAI licence + FSSAI testing scheme
SupportNationwide AMC and spare parts
Water treatmentIndustrial RO plant, 500–10,000 LPH, 55–60% recovery
AutomationSemi-automatic or fully automatic
OptionalPET blow moulding, up to 1,200 bottles/hour

What Is a Mineral Water Plant?

A mineral water plant is a complete production line that purifies raw water and fills it into sealed, labeled bottles or jars ready for sale.

Think of a mineral water plant as a small factory with one job: turning ordinary raw water into clean, sealed bottles you can sell. It works in two halves. The first half cleans the water — sand and carbon filters, RO, mineral dosing and disinfection. The second half bottles it — rinsing, filling, capping, labeling and packing.

Here's something many first-time buyers don't know: in India, most so-called "mineral water plants" actually make packaged drinking water — purified water from any safe source, with minerals added back for taste. Natural mineral water is different; it has to come from a protected underground source. As a mineral water plant manufacturer, Vpack builds lines for both. The bottling machines stay the same — only the water treatment changes.

Why Buy a Complete Mineral Water Plant from One Supplier?

Buying the whole line from one supplier means every machine runs at the same speed, and one team is responsible for installation, training and service.

Let's be honest — starting a water brand isn't just about buying machines. Your plant has to produce safe water every single day, pass FSSAI testing and run smoothly with a small team. That's why most buyers prefer one mineral water plant manufacturer who designs, builds, installs and services the whole line, instead of chasing three different vendors when something goes wrong.

Vpack Machine has been building water and beverage machinery for 14 years at its factory in Pooth Khurd, New Delhi. In that time, our team has seen almost every problem a plant can face — leaking caps, uneven fills, labels slipping, TDS going up and down. Every machine we build today is designed so you don't have to deal with those problems from day one.

How Does a Mineral Water Plant Work? (Step by Step)

A mineral water plant works in 10 steps — from raw water intake to a packed, tested bottle ready for dispatch:

  1. Raw water intake — borewell or municipal water into a raw water tank.
  2. Pre-treatment — sand filter and activated carbon filter remove mud, smell and chlorine.
  3. Micron filtration — removes fine particles before RO.
  4. Reverse osmosis (RO) — removes dissolved salts and impurities.
  5. Mineral dosing — adds minerals back for taste.
  6. Ozonation and UV — kill bacteria and keep water safe inside the bottle.
  7. Bottle making (optional) — PET blow moulding turns preforms into bottles.
  8. Rinsing, filling and capping — one Bottle RFC machine does all three.
  9. Labeling and batch coding.
  10. Shrink packing, lab testing and dispatch.

Which Machines Are Needed for a Mineral Water Plant?

A complete mineral water plant machine setup has six core machines — an RO plant, storage tank, RFC machine, capper, labeler and shrink wrapper — plus an optional PET blow moulding machine. Vpack Machine makes all of them:

MachineWhat it does
Industrial RO PlantRemoves dissolved salts, bacteria and impurities
SS 304 Water Storage TankStores treated water hygienically
Bottle RFC MachineRinses, fills and caps at 24–90 BPM
Capper Machine (VPCL-40M)Seals PVC/metal caps, up to 1,200 bottles/hour
BOPP / Sticker Labeling MachineWrap-around or front/back labels
Shrink Wrapping MachineBundles bottles for transport
PET Blow Moulding Machine (optional)Makes up to 1,200 bottles/hour in-house

One thing people often miss: every mineral water plant machine in the line has to work as a team. The RO plant should make a little more water than the RFC machine can fill, the labeler has to keep up with the filler, and the shrink wrapper has to pack bottles as fast as they arrive. Buy from different vendors, and the slowest machine decides the speed of your whole line. Vpack Machine matches every machine to your chosen BPM, so nothing holds the line back.

Want the full technical details of the bottling machine? See our 30 BPM bottling machine specs.

Which Mineral Water Plant Capacity Should You Choose?

Choose capacity from your daily sales target. A 24 or 30 BPM plant suits most new brands; 60 or 90 BPM suits regional and large producers.

CapacityBottles per hour (approx.)Bottles per 8-hour shiftBest for
24 BPM~1,440~11,500New startups, local supply
30 BPM~1,800~14,400Small brands, one district
60 BPM~3,600~28,800Regional brands
90 BPM~5,400~43,200Large producers

Our advice? Most new brands start with a 24 or 30 BPM plant on one shift. When orders grow, they add a second shift first, and only then move up to a 60 BPM line. If you plan your building and electrical load for the next size from day one, that upgrade later is quick and affordable.

What Licences Do You Need for a Mineral Water Plant in 2026?

Good news if you're starting now: the rules have become simpler. BIS certification is no longer mandatory for packaged drinking water and natural mineral water. Here's what you need instead:

  • FSSAI licence — apply on the FoSCoS portal.
  • FSSAI testing scheme — from 1 January 2026, water must be tested (microbiological, chemical, radiological) at FSSAI-notified NABL-accredited labs, with batch records kept for at least five years.
  • State Pollution Control Board consent to establish and operate.
  • Groundwater NOC if you draw borewell water.
  • GST registration, Udyam (MSME) registration and a trademark for your brand name.

Rules do change from time to time, so always double-check with your consultant before you apply — a good mineral water plant manufacturer will happily guide you through the process. Vpack plants use SS 304 contact parts and a stainless steel RO plant, which helps your water pass these tests consistently.

Is a Mineral Water Plant Profitable?

Yes — as long as you have steady distribution. IMARC's estimates for bottled water plants in India show 35–45% gross margin, 15–25% net margin and a 2–4 year payback. Your biggest running cost will be packaging (PET preforms, caps and labels), which is why many brands later add their own PET blow moulding machine. And with GST on packaged drinking water cut to 5% from 22 September 2025, your bottles are now easier on your customers' pockets too.

How Long Does It Take to Set Up a Mineral Water Plant?

Vpack Machine installs a complete mineral water plant in 15–45 days, depending on capacity and site readiness. Here's how the project runs:

  1. Consultation — budget, target capacity and space.
  2. Plant layout and machine list — RO, RFC, labeling and packing sized together.
  3. Manufacturing and trial run at our Delhi factory.
  4. Installation and commissioning in 15–45 days.
  5. Operator training and handover.
  6. AMC and spare parts after installation.

Why Choose Vpack Machine as Your Mineral Water Plant Manufacturer

  • Manufacturer, not trader — machines built at our own factory in Pooth Khurd, New Delhi
  • 3,000+ installations across India; exports to Dubai, Kenya, Uganda and Sri Lanka
  • Trusted by brands including DS Group, Paras Dairy and Old Monk
  • One supplier for the whole line — RO to shrink packing, plus PET bottle making
  • Fast service in Delhi NCR and nationwide AMC; machine life of 10–15+ years with maintenance

About Vpack Machine — 14 Years of Experience

Vpack Machine Pvt. Ltd. is a mineral water plant manufacturer in Delhi that has spent 14 years designing and building water, beverage and liquid packaging machinery. Led by industry expert Suman Verma, we make every machine at our own factory in Pooth Khurd, New Delhi, and have completed more than 3,000 installations across India and in Dubai, Kenya, Uganda and Sri Lanka.

Some of our customers are first-time entrepreneurs setting up a small water plant; others are established names like DS Group, Paras Dairy and Old Monk. Everyone gets the same support from us — a free plant layout, factory testing before dispatch, on-site installation, operator training and AMC.

Quick Facts: Vpack Mineral Water Plants

  • Manufacturer: Vpack Machine Pvt. Ltd., Pooth Khurd, New Delhi — 14 years of experience
  • Capacity: 24, 30, 60 and 90 bottles per minute
  • Pack sizes: 200 ml bottles to 20-litre jars
  • RO plant: 500 – 10,000 LPH, 55–60% recovery
  • Material: SS 304 food-grade contact parts
  • Installation: 15 – 45 days, with operator training
  • Space needed: 1,500 – 3,000 sq. ft. covered
  • Licence (2026): FSSAI licence + FSSAI testing scheme; BIS no longer mandatory
  • Contact: +91 91356 36541

Start Your Mineral Water Plant with Vpack Machine

FAQs

1. Who is the best mineral water plant manufacturer in Delhi?

Vpack Machine Pvt. Ltd., Pooth Khurd, New Delhi, manufactures complete mineral water plants from RO filtration to shrink packing, with 3,000+ installations across India and exports to Dubai, Kenya, Uganda and Sri Lanka.

2. What bottle sizes can a Vpack mineral water plant fill?

Vpack mineral water plants fill bottles and jars from 200 ml up to 20 litres, at 24, 30, 60 or 90 bottles per minute.

3. Is BIS certification still mandatory for a mineral water plant?

No. FSSAI removed mandatory BIS certification for packaged drinking water and natural mineral water. Manufacturers now need an FSSAI licence and must follow FSSAI's testing scheme, effective 1 January 2026.

4. What licences are needed to start a mineral water plant in 2026?

You need an FSSAI licence, testing under FSSAI's scheme at a notified NABL-accredited lab, State Pollution Control Board consent, a groundwater NOC if you use borewell water, GST registration and, ideally, a trademark for your brand.

5. Is a mineral water plant business profitable?

Yes, with steady distribution. Industry estimates for bottled water plants in India show 35–45% gross margin, 15–25% net margin and a 2–4 year payback, depending on capacity utilisation and local competition.

6. How much space is needed for a mineral water plant?

A small to mid-sized mineral water plant needs about 1,500–3,000 sq. ft. of covered space, depending on capacity and storage tank size.

7. How long does Vpack take to install a mineral water plant?

Vpack Machine installs a mineral water plant in 15–45 days, depending on capacity, customisation and site readiness.

8. What is the difference between mineral water and packaged drinking water?

Natural mineral water comes from a protected underground source with naturally present minerals. Packaged drinking water is treated water from any safe source. In India most "mineral water plants" actually produce packaged drinking water.